GA · EPA Region 4
Georgia Air Permits
Major NSR (PSD & nonattainment)
PSD / 112(g) Construction Permit
PSDFor major sources and major modifications; EPD timeframe goal is 6 months or more.
Title V operating permits
Title V (Part 70) Permit
Title VFiled electronically through GEOS; for a new major source the application is due within one year of beginning operation as a major source. A SIP major source transitional permit applies to facilities that cannot accept synthetic minor limits.
Oil & Gas
Georgia has no significant oil and gas production. EPD's permitting pages list no oil-and-gas-specific air program; pipeline compressor stations follow SIP or Title V permitting.
State air regulations
- Ga. Comp. R. & Regs. Chapter 391-3-1Rules for Air Quality Control
- 391-3-1-.02(2)(tt), (yy)VOC RACT and NOx RACT (permit always required)
- 391-3-1-.03Permits (construction, operating, exemptions, permit-by-rule)
Forms
Guidance
Compliance
State compliance obligations (reporting, emissions inventory, testing) are being indexed. Use the Compliance dashboard preview to see how they will be tracked.
Sources
Editorial note: EPD pages conflict on whether generic permits are currently issued; both statements are reported. Major source thresholds are not stated on the EPD pages reviewed.
AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer