AR · EPA Region 6
Arkansas Air Permits
Major NSR (PSD & nonattainment)
PSD
PSDMajor source permitting in attainment areas under Arkansas's SIP (Rule 19). DEQ notes greenhouse gas permitting applies only to sources otherwise required to obtain a PSD permit.
APC&EC Rule 19Official page
Title V operating permits
Title V Permit
Title VRequired at major source levels or when a federal regulation requires one. Five-year term.
Thresholds (summarized from source, not a quotation)
Per DEQ FAQ 8 (total facility emissions, tpy): CO, NOx, SO2, VOC, PM10, PM2.5 100 or more; lead 10 or more; single HAP 10 or more; combined HAPs 25 or more.
APC&EC Rule 26Official page
Oil & Gas
Arkansas has a minor source General Air Permit for Natural Gas Compression Stations, obtained by Notice of Intent.
General Air Permit for Minor Source Natural Gas Compression Stations
General PermitGeneral permit (1868-AGP-000) for minor source compressor stations.
State air regulations
- APC&EC Rule 18Arkansas Air Pollution Control Code
- APC&EC Rule 19Arkansas Plan of Implementation for Air Pollution Control (SIP)
- APC&EC Rule 26Arkansas Operating Air Permit Program (Title V)
- APC&EC Rule 9Permit Fee Regulations
Forms
Guidance
Compliance
State compliance obligations (reporting, emissions inventory, testing) are being indexed. Use the Compliance dashboard preview to see how they will be tracked.
Sources
Editorial note: Rule PDFs linked are the versions posted on DEQ's site (2016 file dates); check for later amendments. DEQ lists a permit fee factor effective October 1, 2025 under 8 CAR § 12-402.
AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer