Where this text comes from
- Citation
- 40 CFR Part 60, Subpart OOOOb
- Official title
- Subpart OOOOb—Standards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification or Reconstruction Commenced After December 6, 2022
- Text as of
- eCFR current through 2026-10-28, retrieved 2026-10-30
- Latest amendment
- 2026-06-08
- Source note
- 89 FR 17043, Mar. 8, 2024, unless otherwise noted.
Headings and quoted sections on this page are copied from the eCFR text of Subpart OOOOb without changes. AirPermitHub checks eCFR every week and reviews any change before publishing it, so this page can trail eCFR by a few days. eCFR is maintained by the Office of the Federal Register and the Government Publishing Office. It is not an official legal edition of the CFR, and it does not show how an agency has applied the rule in a permit.
Where to look in Subpart OOOOb
Sections sorted by the words in their eCFR headings. Read the full section before relying on it; requirements often sit in more than one place.
- Who is covered
- § 60.5360b§ 60.5365b
- Compliance dates
- § 60.5370b
- Standards and limits
- § 60.5371b§ 60.5375b§ 60.5376b§ 60.5377b§ 60.5380b§ 60.5385b§ 60.5390b§ 60.5393b§ 60.5395b§ 60.5397b§ 60.5398b§ 60.5399b§ 60.5400b§ 60.5401b§ 60.5402b§ 60.5405b§ 60.5410b§ 60.5415b§ 60.5424b
- Showing compliance
- § 60.5370b§ 60.5410b§ 60.5411b§ 60.5412b§ 60.5415b§ 60.5424b
- Monitoring
- § 60.5398b§ 60.5407b§ 60.5416b§ 60.5417b
- Tests, methods, and calculations
- § 60.5386b§ 60.5403b§ 60.5406b§ 60.5408b§ 60.5413b§ 60.5432b
- Notifications, reports, records
- § 60.5420b§ 60.5421b§ 60.5422b§ 60.5423b§ 60.5424b
- Definitions
- § 60.5430b
- General provisions
- § 60.5425b
Who the subpart covers, in the rule's own words
The sections that set out what the subpart applies to, quoted in full from eCFR. Dates, sizes, and other figures are the rule's, not AirPermitHub's.
§ 60.5360b What is the purpose of this subpart?
Open in eCFR(a) Scope. This subpart establishes emission standards and compliance schedules for the control of the pollutant greenhouse gases (GHG). The greenhouse gas standard in this subpart is in the form of a limitation on emissions of methane from affected facilities in the crude oil and natural gas source category that commence construction, modification, or reconstruction after December 6, 2022. This subpart also establishes emission standards and compliance schedules for the control of volatile organic compounds (VOC) and sulfur dioxide (SO2) emissions from affected facilities in the crude oil and natural gas source category that commence construction, modification, or reconstruction after December 6, 2022.
(b) Prevention of Significant Deterioration (PSD) and title V thresholds for Greenhouse Gases. (1) For the purposes of 40 CFR 51.166(b)(49)(ii), with respect to GHG emissions from affected facilities, the “pollutant that is subject to the standard promulgated under section 111 of the Act” shall be considered the pollutant that otherwise is subject to regulation under the Act as defined in 40 CFR 51.166(b)(48) and in any State Implementation Plan (SIP) approved by the EPA that is interpreted to incorporate, or specifically incorporates, 40 CFR 51.166(b)(48).
(2) For the purposes of 40 CFR 52.21(b)(50)(ii), with respect to GHG emissions from affected facilities, the “pollutant that is subject to the standard promulgated under section 111 of the Act” shall be considered the pollutant that otherwise is subject to regulation under the Clean Air Act as defined in 40 CFR 52.21(b)(49).
(3) For the purposes of 40 CFR 70.2, with respect to GHG emissions from affected facilities, the “pollutant that is subject to any standard promulgated under section 111 of the Act” shall be considered the pollutant that otherwise is “subject to regulation” as defined in 40 CFR 70.2.
(4) For the purposes of 40 CFR 71.2, with respect to GHG emissions from affected facilities, the “pollutant that is subject to any standard promulgated under section 111 of the Act” shall be considered the pollutant that otherwise is “subject to regulation” as defined in 40 CFR 71.2.
(c) Exemption. You are exempt from the obligation to obtain a permit under 40 CFR part 70 or 40 CFR part 71, provided you are not otherwise required by law to obtain a permit under 40 CFR 70.3(a) or 40 CFR 71.3(a). Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart.
§ 60.5365b Am I subject to this subpart?
Open in eCFRYou are subject to the applicable provisions of this subpart if you are the owner or operator of one or more of the onshore affected facilities listed in paragraphs (a) through (i) of this section, that is located within the Crude Oil and Natural Gas source category, as defined in § 60.5430b, for which you commence construction, modification, or reconstruction after December 6, 2022. Facilities located inside and including the Local Distribution Company (LDC) custody transfer station are not subject to this subpart.
(a) Each well affected facility, which is a single well drilled for the purpose of producing oil or natural gas.
(1) In addition to § 60.14, a “modification” of an existing well occurs when:
(i) An existing well is hydraulically fractured, or
(ii) An existing well is hydraulically refractured.
(2) For the purposes of a well affected facility, a liquids unloading event is not considered to be a modification.
(3) Except as provided in § 60.5365b(e)(3)(ii)(C) and (i)(3)(ii), any action described by paragraphs (a)(1)(i) and (ii) of this section, by itself, does not affect the modification status of process unit equipment, centrifugal or reciprocating compressors, pumps, or process controllers.
(b) Each centrifugal compressor affected facility, which is a single centrifugal compressor. A centrifugal compressor located at a well site is not an affected facility under this subpart. A centrifugal compressor located at a centralized production facility is an affected facility under this subpart.
Show the rest of § 60.5365b (64 more paragraphs)Hide the rest of § 60.5365b
(c) Each reciprocating compressor affected facility, which is a single reciprocating compressor. A reciprocating compressor located at a well site is not an affected facility under this subpart. A reciprocating compressor located at a centralized production facility is an affected facility under this subpart.
(d) Each process controller affected facility, which is the collection of natural gas-driven process controllers at a well site, centralized production facility, onshore natural gas processing plant, or a compressor station. Natural gas-driven process controllers that function as emergency shutdown devices and process controllers that are not driven by natural gas are not included in the affected facility.
(1) For the purposes of § 60.5390b, in addition to the definition in § 60.14, a modification occurs when the number of natural gas-driven process controllers in the affected facility is increased by one or more.
(2) For the purposes of § 60.5390b, owners and operators may choose to apply reconstruction as defined in § 60.15(b) based on the fixed capital cost of the new process controllers in accordance with paragraph (d)(2)(i) of this section, or the definition of reconstruction based on the number of natural gas-driven process controllers in the affected facility in accordance with paragraph (d)(2)(ii) of this section. Owners and operators may choose which definition of reconstruction to apply and whether to comply with paragraph (d)(2)(i) or (ii) of this section; they do not need to apply both. If owners and operators choose to comply with paragraph (d)(2)(ii) of this section they may demonstrate compliance with § 60.15(b)(1) by showing that more than 50 percent of the number of natural gas-driven process controllers in the affected facility is replaced. That is, if an owner or operator meets the definition of reconstruction through the “number of controllers” criterion in (d)(2)(ii) of this section, they will have shown that the “fixed capital cost of the new components exceeds 50 percent of the fixed capital cost that would be required to construct a comparable entirely new facility,” as required in § 60.15(b)(1). Therefore, an owner or operator may comply with the remaining provisions of § 60.15 that reference “fixed capital cost” through an initial showing that the number of natural gas-driven process controllers replaced exceeds 50 percent. For purposes of paragraphs (d)(2)(i) and (ii), “commenced” means that an owner or operator has undertaken a continuous program of natural gas-driven process controller replacement or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of natural gas-driven process controller replacement.
(i) If the owner or operator applies the definition of reconstruction in § 60.15(b)(1), reconstruction occurs when the fixed capital cost of the new process controllers exceeds 50 percent of the fixed capital cost that would be required to replace all the natural gas-driven process controllers in the affected facility. The “fixed capital cost of the new process controllers” includes the fixed capital cost of all natural gas-driven process controllers which are or will be replaced pursuant to all continuous programs of component replacement which are commenced within any 24-month rolling period following December 6, 2022.
(ii) If the owner or operator applies the definition of reconstruction based on the percentage of natural gas-driven process controllers replaced, reconstruction occurs when greater than 50 percent of the natural gas-driven process controllers at a site are replaced. The percentage includes all natural gas-driven process controllers which are or will be replaced pursuant to all continuous programs of natural gas-driven process controller replacement which are commenced within any 24-month rolling period following December 6, 2022. If an owner or operator determines reconstruction based on the percentage of natural gas-driven process controllers that are replaced, the owner or operator must also comply with § 60.15(a).
(e) Each storage vessel affected facility, which is a tank battery that has the potential for emissions as specified in either paragraph (e)(1)(i) or (ii) of this section. A tank battery with the potential for emissions below both of the thresholds specified in paragraphs (e)(1)(i) and (ii) of this section is not a storage vessel affected facility provided the owner/operator keeps records of the potential for emissions calculation for the life of the storage vessel or until such time the tank battery becomes a storage vessel affected facility because the potential for emissions meets or exceeds either threshold specified in either paragraph (e)(1)(i) or (ii) of this section.
(1)(i) Potential for VOC emissions equal to or greater than 6 tons per year (tpy) as determined in paragraph (e)(2) of this section.
(ii) Potential for methane emissions equal to or greater than 20 tpy as determined in paragraph (e)(2) of this section.
(2) The potential for VOC and methane emissions must be calculated as the cumulative emissions from all storage vessels within the tank battery as specified by the applicable requirements in paragraphs (e)(2)(i) through (iii) of this section. The determination may take into account requirements under a legally and practicably enforceable limit in an operating permit or other requirement established under a Federal, state, local, or Tribal authority.
(i) Beginning January 22, 2027, or upon startup, whichever is later, for purposes of determining the applicability of a storage vessel tank battery as an affected facility, a legally and practicably enforceable limit must include the elements provided in paragraphs (e)(2)(i)(A) through (F) of this section.
(A) A quantitative production limit and quantitative operational limit(s) for the equipment, or quantitative operational limits for the equipment;
(B) An averaging time period for the production limit in (e)(2)(i)(A) of this section, if a production-based limit is used, that is equal to or less than 30 days;
(C) Established parametric limits for the production and/or operational limit(s) in paragraph (e)(2)(i)(A) of this section, and where a control device is used to achieve an operational limit, an initial compliance demonstration (i.e., performance test) for the control device that establishes the parametric limits;
(D) Ongoing monitoring of the parametric limits in (e)(2)(i)(C) of this section that demonstrates continuous compliance with the production and/or operational limit(s) in (e)(2)(i)(A) of this section;
(E) Recordkeeping by the owner or operator that demonstrates continuous compliance with the limit(s) in (e)(2)(i)(A) through (D) of this section; and
(F) Periodic reporting that demonstrates continuous compliance.
(ii) For each tank battery located at a well site or centralized production facility, you must determine the potential for VOC and methane emissions within 30 days after startup of production, or within 30 days after an action specified in paragraphs (e)(3)(i) and (ii) of this section, except as provided in paragraph (e)(5)(iv) of this section. Beginning January 22, 2027, the potential for VOC and methane emissions must be calculated using a generally accepted model or calculation methodology that accounts for flashing, working, and breathing losses, based on the maximum average daily throughput to the tank battery determined for a 30-day period of production.
(iii) For each tank battery not located at a well site or centralized production facility, including each tank battery located at a compressor station or onshore natural gas processing plant, you must determine the potential for VOC and methane emissions prior to startup of the compressor station, onshore natural gas processing plant, or other facility within 30 days after an action specified in paragraphs (e)(3)(i) and (ii) of this section, using either method described in paragraph (e)(2)(iii)(A) or (B) of this section.
(A) Determine the potential for VOC and methane emissions using a generally accepted model or calculation methodology that accounts for flashing, working and breathing losses and based on the throughput to the tank battery established in a legally and practicably enforceable limit in an operating permit or other requirement established under a Federal, state, local, or Tribal authority; or
(B) Determine the potential for VOC and methane emissions using a generally accepted model or calculation methodology that accounts for flashing, working and breathing losses and based on projected maximum average daily throughput. Maximum average daily throughput is determined using a generally accepted engineering model (e.g., volumetric condensate rates from the tank battery based on the maximum gas throughput capacity of each producing facility) to project the maximum average daily throughput for the tank battery.
(3) For the purposes of § 60.5395b, the following definitions of “reconstruction” and “modification” apply for determining when an existing tank battery becomes a storage vessel affected facility under this subpart.
(i) “Reconstruction” of a tank battery occurs when the potential for VOC or methane emissions to meet or exceed either of the thresholds specified in paragraphs (e)(1)(i) or (ii) of this section and—
(A) At least half of the storage vessels are replaced in the existing tank battery that consists of more than one storage vessel; or
(B) The provisions of § 60.15 are met for the existing tank battery.
(ii) “Modification” of a tank battery occurs when any of the actions in paragraphs (e)(3)(ii)(A) through (D) of this section occurs and the potential for VOC or methane emissions meet or exceed either of the thresholds specified in paragraphs (e)(1)(i) or (ii) of this section.
(A) A storage vessel is added to an existing tank battery;
(B) One or more storage vessels are replaced such that the cumulative storage capacity of the existing tank battery increases;
(C) Beginning January 22, 2027, or upon startup, whichever is later, for tank batteries at well sites or centralized production facilities, an existing tank battery receives additional crude oil, condensate, intermediate hydrocarbons, or produced water throughput from actions, including but not limited to, the addition of operations or a production well, or changes to operations or a production well (including hydraulic fracturing or refracturing of the well).
(D) Beginning January 22, 2027, or upon startup, whichever is later, for tank batteries not located at a well site or centralized production facility, including each tank battery at compressor stations or onshore natural gas processing plants, an existing tank battery receives additional fluids which cumulatively exceed the throughput used in the most recent (i.e., prior to an action in paragraph (e)(3)(ii)(A), (B), or (D) of this section) determination of the potential for VOC or methane emissions.
(4) A storage vessel affected facility that subsequently has its potential for VOC emissions decrease to less than 6 tpy shall remain an affected facility under this subpart.
(5) For storage vessels not subject to a legally and practicably enforceable limit in an operating permit or other requirement established under Federal, state, local, or Tribal authority, any vapor from the storage vessel that is recovered and routed to a process through a vapor recovery unit designed and operated as specified in this section is not required to be included in the determination of potential for VOC or methane emissions for purposes of determining affected facility status, provided you comply with the requirements of paragraphs (e)(5)(i) through (iv) of this section.
(i) You meet the cover requirements specified in § 60.5411b(b).
(ii) You meet the closed vent system requirements specified in § 60.5411b(a)(2) through (4) and (c).
(iii) You must maintain records that document compliance with paragraphs (e)(5)(i) and (ii) of this section.
(iv) In the event of removal of apparatus that recovers and routes vapor to a process, or operation that is inconsistent with the conditions specified in paragraphs (e)(5)(i) and (ii) of this section, you must determine the storage vessel's potential for VOC emissions according to this section within 30 days of such removal or operation.
(6) The requirements of this paragraph (e)(6) apply to each storage vessel affected facility immediately upon startup, startup of production, or return to service. A storage vessel affected facility or portion of a storage vessel affected facility that is reconnected to the original source of liquids remains a storage vessel affected facility subject to the same requirements that applied before being removed from service. Any storage vessel that is used to replace a storage vessel affected facility, or portion of a storage vessel affected facility, or used to expand a storage vessel affected facility assumes the affected facility status of the storage vessel affected facility being replaced or expanded.
(7) A storage vessel with a capacity greater than 100,000 gallons used to recycle water that has been passed through two stage separation is not a storage vessel affected facility.
(f) Each process unit equipment affected facility, which is the group of all equipment within a process unit at an onshore natural gas processing plant is an affected facility.
(1) Addition or replacement of equipment for the purpose of process improvement that is accomplished without a capital expenditure shall not by itself be considered a modification under this subpart.
(2) Equipment associated with a compressor station, dehydration unit, sweetening unit, underground storage vessel, field gas gathering system, or liquefied natural gas unit is covered by §§ 60.5400b, 60.5401b, 60.5402b, 60.5421b, and 60.5422b if it is located at an onshore natural gas processing plant. Equipment not located at the onshore natural gas processing plant site is exempt from the provisions of §§ 60.5400b, 60.5401b, 60.5402b, 60.5421b, and 60.5422b.
(g) Each sweetening unit affected facility as defined by paragraphs (g)(1) and (2) of this section.
(1) Each sweetening unit that processes natural gas produced from either onshore or offshore wells is an affected facility; and
(2) Each sweetening unit that processes natural gas followed by a sulfur recovery unit is an affected facility.
(3) Facilities that have a design capacity less than 2 long tons per day (LT/D) of hydrogen sulfide (H2S) in the acid gas (expressed as sulfur) are required to comply with recordkeeping and reporting requirements specified in § 60.5423b(e) but are not required to comply with §§ 60.5405b through 60.5407b and §§ 60.5410b(i) and 60.5415b(k).
(4) Sweetening facilities producing acid gas that is completely re-injected into oil-or-gas-bearing geologic strata or that is otherwise not released to the atmosphere are not subject to §§ 60.5405b through 60.5407b, 60.5410b(i), 60.5415b(k), and 60.5423b.
(h) Each pump affected facility, which is the collection of natural gas-driven pumps at a well site, centralized production facility, onshore natural gas processing plant, or a compressor station. Pumps that are not driven by natural gas are not included in the pump affected facility.
(1) For the purposes of § 60.5393b, in addition to the definition in § 60.14, a modification occurs when the number of natural gas-driven pumps in the affected facility is increased by one or more.
(2) For the purposes of § 60.5393b, owners and operators may choose to apply reconstruction as defined in § 60.15(b) based on the fixed capital cost of the new pumps in accordance with paragraph (h)(2)(i) of this section, or the definition of reconstruction based on the number of natural gas-driven pumps in the affected facility in accordance with paragraph (h)(2)(ii) of this section. Owners and operators may choose which definition of reconstruction to apply and whether to comply with paragraph (h)(2)(i) or (ii) of this section; they do not need to apply both. If owners and operators choose to comply with paragraph (h)(2)(ii) of this section they may demonstrate compliance with § 60.15(b)(1) by showing that more than 50 percent of the number of natural gas-driven pumps is replaced. That is, if an owner or operator meets the definition of reconstruction through the “number of pumps” criterion in paragraph (h)(2)(ii) of this section, they will have shown that the “fixed capital cost of the new components exceeds 50 percent of the fixed capital cost that would be required to construct a comparable entirely new facility,” as required in § 60.15(b)(1). Therefore, an owner or operator may comply with the remaining provisions of § 60.15 that reference “fixed capital cost” through an initial showing that the number of natural gas-driven pumps replaced exceeds 50 percent. For purposes of paragraphs (h)(2)(i) and (ii) of this section, “commenced” means that an owner or operator has undertaken a continuous program of component replacement or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of natural gas-driven pump replacement.
(i) If the owner or operator applies the definition of reconstruction in § 60.15, reconstruction occurs when the fixed capital cost of the new pumps exceeds 50 percent of the fixed capital cost that would be required to replace all the natural gas-driven pumps in the affected facility. The “fixed capital cost of the new pumps” includes the fixed capital cost of all natural gas-driven pumps which are or will be replaced pursuant to all continuous programs of component replacement which are commenced within any 24-month rolling period following December 6, 2022.
(ii) If the owner or operator applies the definition of reconstruction based on the percentage of natural gas-driven pumps replaced, reconstruction occurs when greater than 50 percent of the natural gas-driven pumps in the affected facility are replaced. The percentage includes all natural gas-driven pumps which are or will be replaced pursuant to all continuous programs of component replacement which are commenced within any 24-month rolling period following December 6, 2022. If an owner or operator determines reconstruction based on the percentage of natural gas-driven pumps that are replaced, the owner or operator must comply with § 60.15(a).
(3) A natural gas-driven pump that is in operation less than 90 days per calendar year is not part of an affected facility under this subpart. For the purposes of this section, any period of operation during a calendar day counts toward the 90-calendar day threshold.
(i) Each fugitive emissions components affected facility, which is the collection of fugitive emissions components at a well site, centralized production facility, or a compressor station.
(1) For purposes of § 60.5397b and § 60.5398b, a “modification” to a well site occurs when:
(i) A new well is drilled at an existing well site;
(ii) A well at an existing well site is hydraulically fractured; or
(iii) A well at an existing well site is hydraulically refractured.
(2) For purposes of § 60.5397b and § 60.5398b, a “modification” to centralized production facility occurs when:
(i) Any of the actions in paragraphs (i)(1)(i) through (iii) of this section occurs at an existing centralized production facility;
(ii) A well sending production to an existing centralized production facility is modified, as defined in paragraphs (i)(1)(i) through (iii) of this section; or
(iii) A well site subject to the requirements of § 60.5397b or § 60.5398b removes all major production and processing equipment, such that it becomes a wellhead only well site and sends production to an existing centralized production facility.
(3) For purposes of §§ 60.5397b and 60.5398b, a “modification” to a compressor station occurs when:
(i) An additional compressor is installed at a compressor station; or
(ii) One or more compressors at a compressor station is replaced by one or more compressors of greater total horsepower than the compressor(s) being replaced. When one or more compressors is replaced by one or more compressors of an equal or smaller total horsepower than the compressor(s) being replaced, installation of the replacement compressor(s) does not trigger a modification of the compressor station for purposes of §§ 60.5397b and 60.5398b.
[89 FR 17043, Mar. 8, 2024, as amended at 89 FR 62888, Aug. 1, 2024; 90 FR 35981, July 31, 2025]
Every section in Subpart OOOOb
39 sections and 5 tables, in eCFR order. Each link opens the official text.
- § 60.5360bWhat is the purpose of this subpart?Amended 2024-05-07
- § 60.5365bAm I subject to this subpart?Amended 2025-07-31
- § 60.5370bWhen must I comply with this subpart?Amended 2025-12-03
- § 60.5371bWhat GHG and VOC standards apply to super-emitter events?Amended 2025-07-31
- § 60.5375bWhat GHG and VOC standards apply to well completions at well affected facilities?Amended 2025-07-31
- § 60.5376bWhat GHG and VOC standards apply to gas well liquids unloading operations at well affected facilities?Amended 2024-08-01
- § 60.5377bWhat GHG and VOC standards apply to associated gas wells at well affected facilities?Amended 2026-06-08
- § 60.5380bWhat GHG and VOC standards apply to centrifugal compressor affected facilities?Amended 2024-05-07
- § 60.5385bWhat GHG and VOC standards apply to reciprocating compressor affected facilities?Amended 2024-08-01
- § 60.5386bWhat test methods and procedures must I use for my centrifugal compressor and reciprocating compressor affected facilities?Amended 2024-08-01
- § 60.5390bWhat GHG and VOC standards apply to process controller affected facilities?Amended 2025-07-31
- § 60.5393bWhat GHG and VOC standards apply to pump affected facilities?Amended 2024-08-01
- § 60.5395bWhat GHG and VOC standards apply to storage vessel affected facilities?Amended 2024-08-01
- § 60.5397bWhat GHG and VOC standards apply to fugitive emissions components affected facilities?Amended 2024-08-01
- § 60.5398bWhat alternative GHG and VOC standards apply to fugitive emissions components affected facilities and what inspection and monitoring requirements apply to covers and closed vent systems when using an alternative technology?Amended 2025-07-31
- § 60.5399bWhat are the alternative means of emission limitations for GHG and VOC emissions from well completions, liquids unloading operations, centrifugal compressors, reciprocating compressors, fugitive emissions components, and process unit equipment affected facilities; and what are the alternative fugitive emissions standards based on State, local, and Tribal programs?Amended 2024-05-07
- § 60.5400bWhat GHG and VOC standards apply to process unit equipment affected facilities?Amended 2024-08-01
- § 60.5401bWhat are the alternative GHG and VOC standards for process unit equipment affected facilities?Amended 2024-08-01
- § 60.5402bWhat are the exceptions to the GHG and VOC standards for process unit equipment affected facilities?Amended 2024-08-01
- § 60.5403bWhat test methods and procedures must I use for my process unit equipment affected facilities?Amended 2024-08-01
- § 60.5405bWhat standards apply to sweetening unit affected facilities?Amended 2024-05-07
- § 60.5406bWhat test methods and procedures must I use for my sweetening unit affected facilities?Amended 2024-08-01
- § 60.5407bWhat are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities?Amended 2024-08-01
- § 60.5408bWhat is an optional procedure for measuring hydrogen sulfide in acid gas—Tutwiler Procedure?Amended 2024-05-07
- § 60.5410bHow do I demonstrate initial compliance with the standards for each of my affected facilities?Amended 2024-08-01
- § 60.5411bWhat additional requirements must I meet to determine initial compliance for my covers and closed vent systems?Amended 2025-07-31
- § 60.5412bWhat additional requirements must I meet for determining initial compliance of my control devices?Amended 2025-07-31
- § 60.5413bWhat are the performance testing procedures for control devices?Amended 2025-07-31
- § 60.5415bHow do I demonstrate continuous compliance with the standards for each of my affected facilities?Amended 2025-07-31
- § 60.5416bWhat are the initial and continuous cover and closed vent system inspection and monitoring requirements?Amended 2025-07-31
- § 60.5417bWhat are the continuous monitoring requirements for my control devices?Amended 2026-06-08
- § 60.5420bWhat are my notification, reporting, and recordkeeping requirements?Amended 2026-06-08
- § 60.5421bWhat are my additional recordkeeping requirements for process unit equipment affected facilities?Amended 2024-08-01
- § 60.5422bWhat are my additional reporting requirements for process unit equipment affected facilities?Amended 2024-05-07
- § 60.5423bWhat are my additional recordkeeping and reporting requirements for sweetening unit affected facilities?Amended 2024-05-07
- § 60.5424bWhat are my additional recordkeeping and reporting requirements if I comply with the alternative GHG and VOC standards for fugitive emissions components affected facilities and covers and closed vent systems?Amended 2024-08-01
- § 60.5425bWhat parts of the General Provisions apply to me?Amended 2024-05-07
- § 60.5430bWhat definitions apply to this subpart?Amended 2024-08-01
- § 60.5432bHow do I determine whether a well is a low pressure well using the low pressure well equation?Amended 2024-05-07
- § 60.5433b[Reserved]
Tables and appendices
- TableTable 1 to Subpart OOOOb of Part 60—Alternative Technology Periodic Screening Frequency at Well Sites, Centralized Production Facilities, and Compressor Stations Subject to AVO Inspections With Quarterly OGI or EPA Method 21 MonitoringSee eCFR
- TableTable 2 to Subpart OOOOb of Part 60—Alternative Technology Periodic Screening Frequency at Well Sites and Centralized Production Facilities Subject to AVO Inspections and/or Semiannual OGI or EPA Method 21 MonitoringSee eCFR
- TableTable 3 to Subpart OOOOb of Part 60—Required Minimum Initial SO2 Emission Reduction Efficiency (Zi)See eCFR
- TableTable 4 to Subpart OOOOb of Part 60—Required Minimum SO2 Emission Reduction Efficiency (Zc)See eCFR
- TableTable 5 to Subpart OOOOb of Part 60—Applicability of General Provisions to Subpart OOOObSee eCFR
Amendment history
Dates on which eCFR records a change to any section of Subpart OOOOb, newest first.
- 2026-06-08
- 2026-04-09
- 2025-12-03
- 2025-07-31
- 2024-08-01
- 2024-05-09
- 2024-05-08
- 2024-05-07
To read the rulemakings behind these dates, search the Federal Register for Subpart OOOOb. New EPA air rules and proposals also appear in the Federal Air Rule Tracker.
AirPermitHub provides educational, engineering, research, and compliance-support information. Information provided by the platform does not constitute legal advice and should not replace review of applicable regulations, permits, agency guidance, or consultation with qualified professionals. Full disclaimer